Sunday, November 15, 2026Kansas City metro edition

Kansas City business news, reporting and analysis

Construction & Engineering

Vesper plant lifts metro manufacturing to a 15-year high

A $210 million composites plant in Olathe plus two smaller plants put manufacturing employment at 214,000, the highest level since 2011.

Advanced manufacturing factory floor with heavy industrial machinery
Robotic arms operating on an advanced manufacturing line. Photo: Unsplash

Vesper Composites broke ground in June on a $210 million plant in Olathe that will make carbon fiber battery enclosures, and the metro's manufacturing workforce has now reached 214,000 jobs, the highest count in 15 years. The plant is the largest single project in the region.

The numbers arrived quietly. Missouri and Kansas employment filings reviewed by the Journal show manufacturing payroll in the metro at 214,000, up from 193,400 in 2021 and above any level recorded since 2011, driven less by volume production than by a cluster of specialized plants. State employment data show the count has risen in nine of the last twelve months, with the largest gain in the quarter the Vesper plant was announced.

Vesper Composites is the largest of them. The company makes carbon fiber and advanced composite enclosures for electric vehicle batteries, a business that requires autoclaves, clean rooms and engineering talent in roughly equal measure. The company has been working on battery enclosures for four years, mostly for suppliers outside the country, and this is the first plant it has built.

The Olathe plant covers 480,000 square feet on 92 acres and will employ 420 people once it reaches full output, with 180 positions already filled. Production of the first battery enclosures is scheduled for the first quarter of 2027. The site will include a 40,000 square foot research annex that the company expects to staff with another 90 people.

Two smaller plants announced this year have added to the total. A precision optics company broke ground in Shawnee on a $54 million facility for 140 jobs, and a specialty alloy maker in Lee's Summit is converting a 1970s warehouse into a $38 million plant. That plant makes optical components for machine vision systems, a business that has never had a cluster here before.

We are not competing with a plant that makes brackets. We are competing for the engineers who know how to bond carbon fiber and the crews who run an autoclave.

Cliff Rutherford, chief operating officer — Vesper Composites

The skill mismatch is the part that worries workforce officials. County data show 61% of the new positions require a bachelor's degree or a technical credential, well above the 22% share of the metro's existing manufacturing base that does. Wage data show those roles pay about 30% more than the average manufacturing job in the metro, which is why the competition runs through colleges.

The skill gap behind the plant

The community college response has been quick. Johnson County Community College added a 14-credit advanced composites certificate in August, and its first cohort of 38 students includes 11 employees of Vesper who are studying on the clock. Enrollment is full for the second year, and the college has added a waiting list of 60 students for next fall.

Competitors are watching the same physics problem. A European composites maker is scouting the same corridor, and an electric vehicle battery company has been building its own pilot line in the region since spring. Both have asked for the same labor, and the second has said it may build its own training program if the pipeline tightens further.

From three plants to a corridor

Economic development officials are counting the plant as an anchor for a wider cluster, with two suppliers that have already signed leases in nearby buildings and one that has said it is evaluating a third site. That would make four advanced-materials plants inside a 30 mile radius, which is the kind of density that draws the next one.